<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Cheap Cladding &#187; house claddingCheap Cladding</title>
	<atom:link href="http://cheapcladding.com.au/tag/house-cladding/feed/" rel="self" type="application/rss+xml" />
	<link>http://cheapcladding.com.au</link>
	<description></description>
	<lastBuildDate>Tue, 16 Apr 2013 18:07:17 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.5.1</generator>
		<item>
		<title>2 Installation and Fixing QT Eco Series</title>
		<link>http://cheapcladding.com.au/2-installation-and-fixingqt-eco-series/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=2-installation-and-fixingqt-eco-series</link>
		<comments>http://cheapcladding.com.au/2-installation-and-fixingqt-eco-series/#comments</comments>
		<pubDate>Tue, 16 Apr 2013 05:07:57 +0000</pubDate>
		<dc:creator></dc:creator>
				<category><![CDATA[QT Eco Series]]></category>
		<category><![CDATA[aluminium wall cladding]]></category>
		<category><![CDATA[cladding australia]]></category>
		<category><![CDATA[exterior cladding materials]]></category>
		<category><![CDATA[exterior wall cladding]]></category>
		<category><![CDATA[external cladding for houses]]></category>
		<category><![CDATA[external cladding products]]></category>
		<category><![CDATA[foam cladding]]></category>
		<category><![CDATA[house cladding]]></category>
		<category><![CDATA[house cladding materials]]></category>
		<category><![CDATA[pvc wall panels]]></category>
		<category><![CDATA[stone cladding]]></category>
		<category><![CDATA[timber cladding]]></category>
		<category><![CDATA[vinyl weatherboard cladding]]></category>
		<category><![CDATA[weatherboard cladding]]></category>

		<guid isPermaLink="false">http://cheapcladding.com.au/?p=1084</guid>
		<description><![CDATA[2.1 Panel fixings Fix the QT EcoSeries Wall Panel onto timber battens or metal channels with galvanised 75mm x 3.15 or 3.75mm ring shank nails (timber battens only) or 10g x 75mm Class 3 (AS3566) screws (timber or steel battens) with the addition of QT Buttons in all cases. Panel fixings must be no closer than 50mm [...]]]></description>
				<content:encoded><![CDATA[<h3><strong><span style="color: #800080;">2.1 Panel fixings</span></strong></h3>
<p>Fix the QT EcoSeries Wall Panel onto timber battens or metal channels with galvanised<br />
<strong>75mm x 3.15 or 3.75mm</strong> ring shank nails (timber battens only) or <strong>10g x 75mm Class 3</strong> (<span style="color: #ff6600;">AS3566</span>) screws (timber or steel battens) with the addition of QT Buttons in all cases. Panel fixings must be no closer than <strong>50mm</strong> but no further than <strong>112mm</strong> to the horizontal panel edge and no closer than <strong>50mm</strong> to the vertical edge, while normal fixing centres are at <strong>225mm</strong> maximum centres. It is essential that the vertical and horizontal butt joints be bonded with polyurethane foam adhesive. Also ensure polyurethane foam adhesive is applied to all batten faces prior to the panel being pushed against them for maximum bonding to the support frame. Panels can be joined off stud, if glued to the abutting panel with polyurethane foam adhesive. QT EcoSeries Wall Panels can span <strong>225mm</strong> as an unsupported cantilever. Panels must span across a minimum of two channels or battens and must be installed in a horizontal stretcher bond pattern. To prevent corrosion from salt aerosols in high corrosion zones, (such as geothermal activity or within a <strong>500m</strong> distance from the sea) upgrade fixing screws to <strong>class 4</strong> or stainless steel (<span style="color: #ff6600;">AS3566</span>).</p>
<p style="text-align: center;"><a href="http://thewallstore.com.au/QT_Eco_Series.html"><img class="aligncenter size-full wp-image-1085" alt="50mm panel fixing 50mm panel edge detail" src="http://cheapcladding.com.au/wp-content/uploads/2013/04/50mm-panel-fixing-50mm-panel-edge-detail.png" width="691" height="335" /></a></p>
<h3><strong><span style="color: #800080;">2. 2 Framing</span></strong></h3>
<p>Timber framing must comply with <span style="color: #ff6600;">AS 1684</span> and steel framing must be designed and constructed in accordance with <span style="color: #ff6600;">AS 3623</span>. Minimum distances from end and edge of timber framing members must be observed to avoid splitting. Stud spacing must not exceed <strong>600mm</strong> centres. Noggings must be fitted between studs at <strong>1350mm</strong> maximum centres.</p>
<p>With a <strong>1.8 m</strong> spirit level, check for variations in the frame that are over <strong>6 mm</strong>. Large variations negatively affect weather protection or can appear as visual defects under critical light conditions. If the frame is out of plumb, but not structurally defective, consult with the builder or contractor for remediation.</p>
<p style="text-align: center;"><a href="http://thewallstore.com.au/QT_Eco_Series.html"><img class="aligncenter size-full wp-image-1086" alt="clip and channel system timber batten system" src="http://cheapcladding.com.au/wp-content/uploads/2013/04/clip-and-channel-system-timber-batten-system.png" width="727" height="865" /></a></p>
<p><a href="http://thewallstore.com.au/QT_Eco_Series.html" target="_self"><img class="alignright" alt="find out more" src="http://thewallstore.com.au/images/findoutmore_off.png" width="131" height="29" name="findout" border="0" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://cheapcladding.com.au/2-installation-and-fixingqt-eco-series/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Silhouette BGC FIBRE CEMENT</title>
		<link>http://cheapcladding.com.au/silhouette-bgc-fibre-cement/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=silhouette-bgc-fibre-cement</link>
		<comments>http://cheapcladding.com.au/silhouette-bgc-fibre-cement/#comments</comments>
		<pubDate>Fri, 12 Apr 2013 07:49:25 +0000</pubDate>
		<dc:creator></dc:creator>
				<category><![CDATA[BGC Fibre Cement]]></category>
		<category><![CDATA[aluminium cladding]]></category>
		<category><![CDATA[australian fibre cement]]></category>
		<category><![CDATA[bgc cladding]]></category>
		<category><![CDATA[bgc compressed fibre cement sheeting]]></category>
		<category><![CDATA[bgc fiber cement]]></category>
		<category><![CDATA[cfc sheeting]]></category>
		<category><![CDATA[cladding for houses]]></category>
		<category><![CDATA[colorbond wall cladding]]></category>
		<category><![CDATA[compressed cement sheeting]]></category>
		<category><![CDATA[fc sheeting]]></category>
		<category><![CDATA[fibre cement sheet sizes]]></category>
		<category><![CDATA[fibre cement sheeting sizes]]></category>
		<category><![CDATA[fibre sheeting]]></category>
		<category><![CDATA[house cladding]]></category>
		<category><![CDATA[weatherboard homes]]></category>

		<guid isPermaLink="false">http://cheapcladding.com.au/?p=920</guid>
		<description><![CDATA[Silhouette opens a whole new world of possibilities for creating a building’s personality. SilhouetteT allows architects, developers and builders to select from a range of feature details or even to create their own custom design for external claddings. Attractive and competitively priced, Silhouette offers a fresh approach to cladding options. Silhouette comprises of a fibre cement plank [...]]]></description>
				<content:encoded><![CDATA[<p><strong><a href="http://thewallstore.com.au/BGC_Fibre_Cement.html"><img class="size-full wp-image-921 alignright" alt="silhouette external cladding" src="http://cheapcladding.com.au/wp-content/uploads/2013/04/silhouette-external-cladding.png" width="163" height="369" /></a>Silhouette opens a whole new world of possibilities for creating a building’s personality. SilhouetteT allows architects, developers and builders to select from a range of feature details or even to create their own custom design for external claddings.</strong></p>
<p>Attractive and competitively priced, Silhouette offers a fresh approach to cladding options.</p>
<p>Silhouette comprises of a fibre cement plank and a uPVC feature strip. Together these components clip together to obscure fixing points and to form a seamless cladding appearance of your choice.</p>
<p><strong><span style="color: #ff6600;">The Silhouette exterior cladding system:</span></strong></p>
<ul>
<li><span style="font-size: 1em; line-height: 1.5; color: #ff6600;">choice of 3 individual profiles – </span><span style="font-size: 1em; line-height: 1.5; color: #ff6600;">urban, coastal and classic</span></li>
<li><span style="color: #ff6600; font-size: 1em; line-height: 1.5;">custom design profiles</span></li>
<li><span style="color: #ff6600; font-size: 1em; line-height: 1.5;">unique and stylish</span></li>
<li><span style="color: #ff6600; font-size: 1em; line-height: 1.5;">simple and quick to install – just clip in profile</span></li>
<li><span style="color: #ff6600; font-size: 1em; line-height: 1.5;">economical – no waste in laps</span></li>
<li><span style="color: #ff6600; font-size: 1em; line-height: 1.5;">lightweight material</span></li>
</ul>
<table width="100%" border="1">
<tbody>
<tr bgcolor="#99ccCC">
<td style="text-align: center;"><strong>THICKNESS</strong><br />
<strong> (mm)</strong></td>
<td style="text-align: center;"><strong>WIDTH</strong><br />
<strong> (mm &amp; PATTERN)</strong></td>
<td style="text-align: center;"><strong>LENGTH</strong><br />
<strong> (mm)</strong></td>
</tr>
<tr>
<td style="text-align: center;" rowspan="2">7.5</td>
<td style="text-align: center;">230 Smooth</td>
<td style="text-align: center;">4200</td>
</tr>
<tr>
<td style="text-align: center;">180 Smooth</td>
<td style="text-align: center;">4200</td>
</tr>
</tbody>
</table>
<p><span style="font-size: xx-small;">*some sizes may not be available in all states, please check with your local BGC office for availability.</span></p>
<p><a href="http://www.thewallstore.com.au/BGC_Fibre_Cement.html"><img class="alignright" alt="Find Out More" src="http://www.thewallstore.com.au/images/findoutmore_off.png" width="131" height="29" name="Image50" border="0" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://cheapcladding.com.au/silhouette-bgc-fibre-cement/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>4.0 System Installation PowerFloor</title>
		<link>http://cheapcladding.com.au/4-0-system-installation-powerfloor/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=4-0-system-installation-powerfloor</link>
		<comments>http://cheapcladding.com.au/4-0-system-installation-powerfloor/#comments</comments>
		<pubDate>Fri, 05 Apr 2013 04:15:58 +0000</pubDate>
		<dc:creator></dc:creator>
				<category><![CDATA[CSR Hebel Power Floor Design Guide]]></category>
		<category><![CDATA[aluminium cladding]]></category>
		<category><![CDATA[cladding materials]]></category>
		<category><![CDATA[cladding systems]]></category>
		<category><![CDATA[exterior cladding]]></category>
		<category><![CDATA[floor insulation]]></category>
		<category><![CDATA[hebel floor]]></category>
		<category><![CDATA[hebel houses]]></category>
		<category><![CDATA[hebel installers]]></category>
		<category><![CDATA[hebel panels price]]></category>
		<category><![CDATA[hebel wall system]]></category>
		<category><![CDATA[hebel wall systems]]></category>
		<category><![CDATA[house cladding]]></category>
		<category><![CDATA[modular wall systems]]></category>
		<category><![CDATA[timber floor framing]]></category>
		<category><![CDATA[vinyl cladding]]></category>

		<guid isPermaLink="false">http://cheapcladding.com.au/?p=544</guid>
		<description><![CDATA[4.1 Delivery &#38; Storage Unloading Bundles Panels shall be unloaded and moved with only approved lifting devices. Before use, the lifting device should be checked for the required lifting tags. Panels should be unloaded as close as possible to the intended installation area. This will increase work efficiency and minimise the need for secondary lifting. [...]]]></description>
				<content:encoded><![CDATA[<h2><strong><span style="color: #0000ff;">4.1 Delivery &amp; Storage</span></strong></h2>
<h4><strong><span style="color: #ff9900;">Unloading Bundles</span></strong></h4>
<p>Panels shall be unloaded and moved with only approved lifting devices. Before use, the lifting device should be checked for the required lifting tags. Panels should be unloaded as close as possible to the intended installation area. This will increase work efficiency and minimise the need for secondary lifting.</p>
<p style="padding-left: 30px;"><span style="color: #ff99cc;"><strong>Note</strong>: Secondary handling increases the risk of panel damage. The repair of damage sustained during lifting and moving is the responsibility of the lifter. Where damage is excessive, panels must be replaced.</span></p>
<h4><span style="color: #ff9900;"><strong>Storage</strong></span></h4>
<p>All materials must be kept dry and preferably stored under cover. Care should be taken to avoid sagging or damage to ends, edges and surfaces.</p>
<p>All Hebel products must be stacked on edge and properly supported off the ground, on a level platform. Panel bundles can be stacked two high. <span style="color: #00ccff;">The project engineer should be consulted as to the adequacy of the structure to support the stacked bundles.</span> Each bundle contains 10 Hebel PowerFloor panels. Where bundles are stacked two high, the supporting cleats must be vertically aligned, to ensure minimal bending of the lower panels. Refer to Fig 3.</p>
<p>If Hebel PowerFloor panels are stored outside, they must be stored off the ground and protected from the weather</p>
<p>Only single bundles positioned on the ground can be opened. To provide a level surface, we recommend placing temporary joists beneath the supporting cleats.</p>
<p style="text-align: center;"><span style="color: #666699;"><strong>Fig 4.1.1. Stacking Bundles of Hebel PowerFloor</strong></span></p>
<p style="text-align: center;"><a href="http://thewallstore.com.au/Hebel_Boards_Panels.html"><img class="aligncenter size-full wp-image-545" alt="fig 4.1.1 stacking bundles of hebel powerfloor" src="http://cheapcladding.com.au/wp-content/uploads/2013/04/fig-4.1.1-stacking-bundles-of-hebel-powerfloor.png" width="455" height="307" /></a></p>
<h4><span style="color: #ff9900;"><strong>*Unstraping Bundles</strong></span></h4>
<p>Ensure appropriate bracing is installed to bundles prior to removal of strapping to prevent panels from falling. Panels can be held together with sash clamps, ratchet straps or Hebel stabilising bars.</p>
<p style="text-align: center;"><a href="http://thewallstore.com.au/Hebel_Boards_Panels.html"><img class="aligncenter size-full wp-image-546" alt="fig 4.1.2. strapped bundles" src="http://cheapcladding.com.au/wp-content/uploads/2013/04/fig-4.1.2.-strapped-bundles.png" width="481" height="306" /></a></p>
<h2><strong><span style="color: #0000ff;">4.2 Panel Handling</span></strong></h2>
<h4><strong><span style="color: #ff9900;">Manual Handling</span></strong></h4>
<p>To minimise the possibility of manual handling injuries, CSR Hebel suggests the following:</p>
<ul>
<li><span style="font-size: 1em; line-height: 1.5;">Use mechanical aids, such as trolleys, </span><span style="font-size: 1em; line-height: 1.5;">fork lifts, cranes and levers, or team </span><span style="font-size: 1em; line-height: 1.5;">lifting to move panels.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Keep the work place clean to reduce </span><span style="font-size: 1em; line-height: 1.5;">the risk of slips, trips and falls which </span><span style="font-size: 1em; line-height: 1.5;">can cause injury.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Plan the sequence of installation to </span><span style="font-size: 1em; line-height: 1.5;">minimise panel movements and avoid </span><span style="font-size: 1em; line-height: 1.5;">awkward lifts.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Keep the panels dry.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Train employees in good lifting </span><span style="font-size: 1em; line-height: 1.5;">techniques to minimise the risk </span><span style="font-size: 1em; line-height: 1.5;">of injury.</span></li>
</ul>
<p>Hebel products are cement-based, which may irritate the skin, resulting in itching and occasionally a red rash. The wearing of gloves and suitable clothing to reduce abrasion and irritation of the skin is recommended when handling Hebel products.</p>
<p style="text-align: center;"><a href="http://thewallstore.com.au/Hebel_Boards_Panels.html"><img class="aligncenter  wp-image-547" alt="Manual Handling" src="http://cheapcladding.com.au/wp-content/uploads/2013/04/Manual-Handling.png" width="485" height="4 69" /></a></p>
<h2><strong><span style="color: #0000ff;">4.3 Tools and Equipment</span></strong></h2>
<p>The basic tools required to assist in the installation of the Hebel PowerFloor are shown in Figure 4.1. These may be purchased through CSR Hebel and include:</p>
<ol>
<li><span style="font-size: 1em; line-height: 1.5;">Mixing bucket</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Stirrer</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Trowel</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Sanding float</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Panel lifters</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Levelling plane</span></li>
</ol>
<p><span style="font-size: 1em; line-height: 1.5;">Extra equipment will also be required </span><span style="font-size: 1em; line-height: 1.5;">and includes the following:</span></p>
<ul>
<li><span style="font-size: 1em; line-height: 1.5;">Power drill (clutch driven)</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Power saw with metal or diamond </span><span style="font-size: 1em; line-height: 1.5;">tipped cutting blades</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Dust extraction system</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Sockets and bits for screws</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Personal Protective Equipment (PPE) </span><span style="font-size: 1em; line-height: 1.5;">such as goggles, face mask and P1/P2 </span><span style="font-size: 1em; line-height: 1.5;">dust masks, used when site cutting </span><span style="font-size: 1em; line-height: 1.5;">the panels</span></li>
</ul>
<p style="text-align: center;"><span style="color: #d0816c;"><strong>Fig 4.1.1. The Basic Tools and Equipment Requirements</strong></span></p>
<p style="text-align: center;"><a href="http://thewallstore.com.au/Hebel_Boards_Panels.html"><img class="aligncenter size-full wp-image-550" alt="fig 4.1.1 the basic tools and equipment requirements" src="http://cheapcladding.com.au/wp-content/uploads/2013/04/fig-4.1.1-the-basic-tools-and-equipment-requirements.png" width="450" height="439" /></a></p>
<h2><strong><span style="color: #0000ff;">4.4 Panel Installation</span></strong></h2>
<h4><strong><span style="color: #ff9900;">Installation Procedures</span></strong></h4>
<p>CSR Hebel promotes and advocates a safety conscious work place at all times. To assist builders and contractors to maintain their safety standards, CSR Hebel has produced guidelines for the installation and handling of their products. Contact CSR Hebel for additional information.</p>
<h4><strong><span style="color: #ff9900;">Mortars &amp; Adhesives</span></strong></h4>
<p>The Hebel bagged mortar and adhesive should be prepared in accordance with instructions on the packaging.</p>
<h4><strong><span style="color: #ff9900;">Damaged Panels</span></strong></h4>
<p>Chipped or damaged panels are to be repaired using Hebel Patching Mortar. Your Hebel supplier should be notified immediately of any panel damage or cracking that occurs during the handling of the panels. This damage may result in the panel being structurally inadequate, in which case it must be replaced.</p>
<h4><strong><span style="color: #ff9900;">Panel Cutting</span></strong></h4>
<p>Hebel PowerFloor Panels to be cut with a circular saw fitted with a diamond tipped blade. The use of power tools may cause dust, which contains respirable crystalline silica, with the potential to cause bronchitis, silicosis and lung cancer after repeated and prolonged exposure. When using power or hand tools on Hebel products, wear a <strong>P1</strong> or <strong>P2</strong> respirator and eye protection. When cutting, routing or chasing Hebel products with power tools, use dust extraction equipment and wear hearing protection. Refer to CSR Hebel MSDS sheets.</p>
<p>Reinforcement exposed during cutting is to be coated with a liberal application of Fentak.</p>
<h2><strong><span style="color: #0000ff;">4.5 Hebel PowerFloor Installation Sequence</span></strong></h2>
<h4><strong><span style="color: #ff6600;">1. Preparation of Framing for Hebel PowerFloor Panel Installation<a href="http://thewallstore.com.au/Hebel_Boards_Panels.html"><img class="alignright size-thumbnail wp-image-551" alt="panel surface preparation" src="http://cheapcladding.com.au/wp-content/uploads/2013/04/panel-surface-preparation2-150x150.png" width="150" height="150" /></a></span></strong></h4>
<ul>
<li><span style="font-size: 1em; line-height: 1.5;">Check floor framing is complete and within level tolerances.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Provide set-out chalk lines, as required.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Provide temporary installation platform where necessary.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Ensure floor framing has adequate strength to support </span><span style="font-size: 1em; line-height: 1.5;">Hebel PowerFloor bundles.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Position Hebel PowerFloor bundles on the floor framing.</span></li>
</ul>
<h4><strong><span style="color: #ff6600;">2. Hebel PowerFloor Panel Installation<a href="http://thewallstore.com.au/Hebel_Boards_Panels.html"><img class="size-thumbnail wp-image-552 alignleft" alt="hebel powerfloor panel installation" src="http://cheapcladding.com.au/wp-content/uploads/2013/04/hebel-powerfloor-panel-installation-150x150.png" width="150" height="150" /></a></span></strong></h4>
<ul>
<li><span style="font-size: 1em; line-height: 1.5;">Panels are to be installed in a stretcher bond pattern, with a </span><span style="font-size: 1em; line-height: 1.5;">minimum overlap of 1 joist space and not less than <strong>450mm</strong>.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Use lifting handles or trolley to move the panels to installation area.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Apply a <strong>5mm</strong> min. bead of Fuller Max Bond construction adhesive </span><span style="font-size: 1em; line-height: 1.5;">(or equivalent) to top of joists in accordance with manufacturer’s </span><span style="font-size: 1em; line-height: 1.5;">instructions, and apply Hebel Adhesive to appropriate panel edges.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Panels must be installed with minimal horizontal sliding on the joists </span><span style="font-size: 1em; line-height: 1.5;">to ensure a good bond. Force the tongue and groove joint closed </span><span style="font-size: 1em; line-height: 1.5;">as the panel is rolled and lowered onto the joists. Ensure all joints </span><span style="font-size: 1em; line-height: 1.5;">are tight and that adhesive makes full contact along all joints.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Screw fix panel to the joists as required.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Repeat process, removing excess Hebel Adhesive<a href="http://thewallstore.com.au/Hebel_Boards_Panels.html"><img class="alignright size-thumbnail wp-image-553" alt="penetration detailing" src="http://cheapcladding.com.au/wp-content/uploads/2013/04/penetration-detailing-150x150.png" width="150" height="150" /></a>.</span></li>
</ul>
<h4><strong><span style="color: #ff6600;">3. Penetration Detailing</span></strong></h4>
<ul>
<li><span style="font-size: 1em; line-height: 1.5;">Install blocking to support Hebel PowerFloor panel at major openings.</span></li>
</ul>
<h4><strong><span style="color: #ff6600;"><a href="http://thewallstore.com.au/Hebel_Boards_Panels.html"><img class="alignleft size-thumbnail wp-image-554" alt="floor finishes" src="http://cheapcladding.com.au/wp-content/uploads/2013/04/floor-finishes-150x150.png" width="150" height="150" /></a>4. Floor Finishes</span></strong></h4>
<ul>
<li><span style="font-size: 1em; line-height: 1.5;">Sweep the floor surface to remove debris and loose particles.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Fill joints and screw holes with Hebel Adhesive, as required.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Ensure perimeter is not chipped.</span></li>
<li><span style="font-size: 1em; line-height: 1.5;">Install floor covering for Hebel PowerFloor system in accordance </span><span style="font-size: 1em; line-height: 1.5;">with manufacturer’s specifications.</span></li>
</ul>
<p style="padding-left: 30px;"><span style="color: #ff99cc;"><strong>Note:</strong> Ensure panel moisture content is within limits outlined by the floor covering manufacturer.</span></p>
<p><a href="http://thewallstore.com.au/Hebel_Boards_Panels.html" target="_self"><img class="alignright" alt="find out more" src="http://thewallstore.com.au/images/findoutmore_off.png" width="131" height="29" name="findout" border="0" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://cheapcladding.com.au/4-0-system-installation-powerfloor/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
